●High-thickness coating
●Strong, firm and wear-resistant paint film
●Good water and salt water resistance
color | grey |
Mixing ratio | Main agent/curing agent = 4/1 (weight ratio) |
solid,% | 90±2 |
Dry film thickness | Dry film: 70μm/pass Wet film: 130μm/pass |
Coating rate | Dosage: 0.3-0.35kg/m2 |
Actual value: It is related to many factors such as surface treatment, external environment, construction method, etc. | |
Technical indicators (implementing HG/T4340-2012 standard) |
Test items | Technical indicators | Measured | Implementation standards |
Status in container | After stirring and mixing evenly, there should be no lumps and it should be in a uniform state | qualified | Visual inspection |
No copies will be issued, % ≥ | 70 | 80 | GB/T1725-2007 |
Storage stability (sedimentation), grade | 8 | 8 | — |
Applicable period, h ≥ | 6 | 6 | — |
Bending test, mm ≤ | 2 | 1 | Visual inspection |
Drying time: Surface dry, hThrough dry, h |
3 | 1.5 | GB/T1728-1979 Method B |
twenty four | 6 | GB/T1728-1979 Method A | |
Impact resistance, cm | 50 | 50 | GB/T1732-1993 |
Adhesion, Mpa ≥ | 5 | 5 | GB/T5210-2006 |
Remove grease according to SSPC-SP1 solvent cleaning standard.
Remove welding spatter and treat welds and burrs to make them smooth.
Use sandblasting to remove rust, scale and damaged shop primer to ISO Sa2.5 (SSPC-SP10) or use power tools to treat the surface to ISO St3.0.
Use high-pressure air to blow away dust and other dirt.
Confirm the surface before construction
2. The substrate must be dusted and degreased.
3. It can be sprayed or brushed.
4. Dilute with epoxy paint thinner.
5. When using, it should be strictly prepared according to the marked ratio, stirred evenly, and applied after 10 minutes. The prepared paint should be used up on the same day.
6. The construction temperature should be above 5°C.
7. The validity period of epoxy micaceous iron intermediate paint is one year.
● Mixed use period
Temperature(℃) | 5 | 10 | 25 | 30 |
Mixing period (hrs) | 10 | 4 | 2 | 1 |
● Construction method
Airless spray, air spray, brush and roller | |
Airless spray | Airless spray |
Nozzle size | 0.021-0.025 |
Outlet pressure | 100-150kg/cm2 |
Dilution ratio | 0-5% by wt |
● Thinner Epoxy Thinner
● Drying time and coating interval
Temperature(℃) | 5 | 10 | 25 | 30 |
Surface dry(hrs) | 4 | 3 | 1.5 | 1 |
Working (hrs) | twenty four | 10 | 6 | 4 |
Minimum painting interval (hrs) | 20 | 8 | 4 | 3 |
Maximum painting interval (days) | 1 | 1 | 1 | 1 |
● Painting matching
Applicable substrate Cement or concrete floor
Applicable coating Epoxy zinc-rich primer TA-50 Polyurethane thin coating topcoat TAJ-8500
During transportation, the environment of the carriage should be dry and closed, the materials should be stacked stably, and the relevant regulations should be met.
Product safety and health data are available upon request. The following measures should be ensured during any paint application:
● Avoid contact with skin and eyes.
● If paint comes into contact with skin, wash with warm water and/or an appropriate detergent. If paint comes into contact with eyes, rinse with plenty of water and seek medical attention immediately.
● Ensure good ventilation.
● Paint contains flammable substances. Please keep away from sparks and prohibit smoking in the vicinity.
● Comply with all health and safety regulations on site.