●High adhesion to epoxy topcoat
●High coating thickness, high compressive strength and long-lasting durability
color | Various |
Mixing ratio | Main agent/curing agent = 4/1 (weight ratio) |
solid,% | 85/80±2 |
Painting times | 1~2 times |
Dry film thickness, mm | 1 |
Coating rate | Dosage: 0.3~1kg/m2 |
Actual value: It is related to many factors such as surface treatment, external environment, construction method, etc. | |
Main technical indicators (implement GB/T22374-2008 floor coating material primer standard) This table is missing |
● Old floors with paint
Completely grind away loose or incompatible old coatings to expose the concrete surface. Clean, dry and intact compatible coatings do not need to be removed.
● Oily floors
Oil stains will seriously affect the adhesion of floor coatings to the base surface. Oily floors must be completely cleaned and polished.
● New concrete floors
Make sure the floor has exceeded the maintenance period and the moisture content of the floor is less than 6%. It is critical to use mobile sandblasting tools and grinding equipment to treat the concrete surface to achieve the correct surface roughness.
Painting environment humidity range: Relative humidity is less than 80%.
Ventilation conditions: The construction site should be ventilated and dust-free. However, there should be no strong wind to avoid dust from being brought in and affecting the appearance.
Temperature(℃) | 5 | 10 | 25 | 30 |
Mixing period (min) | 60 | 40 | 25 | 10 |
● Construction method
Scraping and troweling | |
Scrape | Use a flat knife to scrape mortar or putty |
Trowel | Choose a trowel with appropriate tooth length according to the coating thickness requirements. For troweling a coating film with a thickness of 1mm, generally choose a trowel with a tooth length of 2mm. |
● Thinner —
● Drying time and coating interval
Temperature(℃) |
5 |
10 |
25 |
30 |
Surface dry(hrs) |
24 |
10 |
4 |
3 |
Working (hrs) |
48 |
24 |
12 |
10 |
Minimum painting interval (hrs) |
36 |
18 |
6 |
5 |
Maximum painting interval (days) |
2 |
1 |
1 |
1 |
● Painting support
Applicable substrate Cement or concrete floor
Applicable coating Epoxy primer TA-1511, epoxy topcoat
During transportation, the environment of the carriage should be dry and closed, the materials should be stacked stably, and the relevant regulations should be met.
● Avoid contact with skin and eyes.
● If paint comes into contact with skin, wash with warm water and/or an appropriate detergent. If paint comes into contact with eyes, rinse with plenty of water and seek medical attention immediately.
● Ensure good ventilation.
● Paint contains flammable substances. Please keep away from sparks and prohibit smoking in the vicinity.
● Comply with all health and safety regulations on site.