●Abrasion-resistant, pressure-resistant, impact-resistant, good leveling property
●Resistant to water, alkali, salt and oil corrosion, good anti-corrosion performance
color | Various |
Mixing ratio | Main agent/curing agent = 4/1 (weight ratio) |
solid,% | 90±2 |
Painting times | 1 time |
Dry film thickness, mm | 0.7~1 |
Coating rate | Dosage: 0.8~1.2kg/m2 |
Actual value: It is related to many factors such as surface treatment, external environment, construction method, etc. | |
Main technical indicators (implement GB/T22374-2008 floor coating material primer standard) This table is missing |
● Old floors with paint
Completely grind away loose or incompatible old coatings to expose the concrete surface. Clean, dry and intact compatible coatings do not need to be removed.
● Oily floors
Oil stains will seriously affect the adhesion of floor coatings to the base surface. Oily floors must be completely cleaned and polished.
● New concrete floors
Make sure the floor has exceeded the maintenance period and the moisture content of the floor is less than 6%. It is critical to use mobile sandblasting tools and grinding equipment to treat the concrete surface to achieve the correct surface roughness.
Painting environment humidity range: Relative humidity is less than 80%.
Ventilation conditions: The construction site should be ventilated and dust-free. However, there should be no strong wind to avoid dust from being brought in and affecting the appearance.
Temperature(℃) | 5 | 10 | 25 | 30 |
Mixing period (min) | 60 | 40 | 25 | 10 |
● Construction method
Trowel | |
Trowel | Trowel coating: Choose a trowel with appropriate tooth length according to the coating thickness requirements. For trowel coating of 1mm thickness, generally choose a trowel with 2mm tooth length. It is important to use a needle-type exhaust roller to penetrate the coating during the construction process to avoid bubbles. |
● Thinner —
● Drying time and coating interval
Temperature(℃) |
5 |
10 |
25 |
30 |
Surface dry(hrs) |
18 |
12 |
4 |
3 |
Working (hrs) |
36 |
24 |
12 |
10 |
Minimum painting interval (hrs) |
24 |
18 |
11 |
9 |
Maximum painting interval (days) |
1 |
1 |
1 |
1 |
● Painting support
Applicable substrate Cement or concrete floor
Applicable coating Epoxy primer TA-1511, TA-7501, TA-7511
During transportation, the environment of the carriage should be dry and closed, the materials should be stacked stably, and the relevant regulations should be met.
● Avoid contact with skin and eyes.
● If paint comes into contact with skin, wash with warm water and/or an appropriate detergent. If paint comes into contact with eyes, rinse with plenty of water and seek medical attention immediately.
● Ensure good ventilation.
● Paint contains flammable substances. Please keep away from sparks and prohibit smoking in the vicinity.
● Comply with all health and safety regulations on site.